2011 - 2012
The result of the trials started in 2002 with Poncirus Trifoliata var. monstrosa finally coming into production..1 million trees grafted on Poncirus T...
2011
The first coloured pots produced in Portugal go out into the field. These have with a rim that will accept the re-designed label.The label together wi...
2010
Polytechnik supply a 1000 kW Biomass boiler. Installation is completed in October ready for the winter.A 24 cell cell-tray is designed and made in Por...
2009
Flier Systems delivers a grading line for grading the cell grown rootstocks. The machine removes the cells from the cell tray and places them in indiv...
2008 QLS 2nd phase
Construction was started on a further 20.000m3 of QLS greenhouse.Present at the inauguration in September were the Minister of Agriculture, Engº ...
Renewable Energy
During this year 12,000 Casuarina glauca trees will be planted. The area will be irrigated utilising the waste water from the reverse osmosis filters ...
2007 QLS 1st phase
The first phase of a three phase, 30.000 m2 greenhouse project was started.The 5000 m2 has a QLS (Ludvig Svenssen) plastic retractable roof and 50% re...
12cm Pot Production
A section has been built to allow 12 cm pots crops to be grown outdoors. This has resulted in a more compact, robust plant which will carry plenty of ...
MPS GAP Accredited
Viveiros do Foral have successfully gained accreditation from the MPS GAP. This follows an external audit by MPS, Holland which verifies the that guid...
2006 Propagation news – IVIA contract
Foral have recently signed a contract with the Institute Valenciano de Investigação Agrária (IVIA) at Moncada, Valencia, Spain to...